Invitation for Bid: Culvert Replacement, Bridge & Riparian Construction Sandpiper East Apartments, Kelsey Creek, Bellevue WA

Bid Posted

December 10, 2024

Description

This project at the Sandpiper East Apartments in Bellevue, WA is the construction of a replacement roadway bridge crossing over Kelsey Creek. The project includes demolition, dewatering, concrete foundations, precast concrete girders, bridge rails and bridge deck, utility connections and riparian corridor improvements including large woody material placement in the creek.

Scope of Work

Please refer to the INVITATION TO BID for Culvert Replacement, Bridge and Riparian Construction Sandpiper East Apartments, Kelsey Creek, Bellevue WA, the first document listed in the document section below.

Project Manual Distribution Packet

Date of issue: 12/10/2024. The INVITATION TO BID for Culvert Replacement, Bridge and Riparian Construction Sandpiper East Apartments, Kelsey Creek, Bellevue WA can be downloaded from the website. Please see below for the documents. The REVISED INVITATION TO BID for Culvert Replacement, Bridge and Riparian Construction Sandpiper East Apartments, Kelsey Creek, Bellevue, WA can be downloaded from the website. It is the second document listed under ADDENDA. There were some titling discrepancies which were corrected.

Pre-Bid Meeting

12/19/2024 at 10:00 a.m.
Sandpiper East Apartments
1312 139th Ave NE, Bellevue, Wa 98005

Contact Person

John Eliason
Vice President of Development
JohnE@kcha.org

Question deadline: 01/16/2025 at 05:00 p.m.

Bid Deadline

January 28, 2025 2:00 pm

Bid Documents